page-header

Switchgear and Paralleling Controls

Cat EGP Switchgear

Configuration
Traditional customizable PLC based floor standing switchgear capable of controlling and monitoring multiple utilities, generators, and loads
Modes of Operation
Multi-unit Island and multi-unit standby mode with optional redundant controls and components.
Application
LV and MV (208V - 38 kV)
Details

Cat EGP Switchgear

Configuration
Traditional customizable PLC based floor standing switchgear capable of controlling and monitoring multiple utilities, generators, and loads
Modes of Operation
Multi-unit Island and multi-unit standby mode with optional redundant controls and components.
Application
LV and MV (208V - 38 kV)
Details

Cat XLM Switchgear

Configuration
Traditional customizable PLC based floor standing switchgear capable of controlling and monitoring multiple utilities, generators, and loads
Modes of Operation
Emergency Standby, Utility Import/Export, Peak shaving, and base load operations with redundant controls and components. Closed transition to/from generator power
Application
LV and MV ( 208V - 38 kV
Details

Emergency Transfer Load manager

Configuration
Wall mounted paralleling control system that monitors and controls a single generator and a single utility.
Modes of Operation
Utility Import, Export, and base load operations, Peak shaving, and Emergency Standby. Closed Transition to/from Generator Power
Application
LV and MV (208V-32kV)
Details

Engine Generator Integrated Switchgear

Configuration
Floor Standing modular switchgear paralleling system (Master Breaker Panel for the first 2 gensets, separate structures for up to 8 additional gensets , utility, and load control/distribution)
Modes of Operation
Emergency Standby with redundant master control. Utility paralleling, peak shaving, and closed transition to/from Generator Power (with optional utility control panel)
Application
LV only (208V - 480V)
Details

Engine Paralleling and Integration Control (EPIC)

Configuration
Remote modular paralleling control system (Master Control Panel for the first 2 gensets, separate add-on control panels for up 8 more gensets, and optional control panel for 1 utility breaker)
Modes of Operation
Emergency Standby with redundant master control, Utility paralleling, peak shaving, and closed transition to/from Generator Power (with optional utility control panel)
Application
LV and MV (208V-27kV)
Details